• Login
    View Item 
    •   USU-IR Home
    • School of Postgraduate
    • Master Theses (Master of Management)
    • View Item
    •   USU-IR Home
    • School of Postgraduate
    • Master Theses (Master of Management)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Strategi Optimalisasi Penyerapan Anggaran PT PLN (Persero) Unit Induk Pembangunan Sumatera Bagian Utara

    Strategy for Optimizing Budget Absorption of PT PLN (Persero) Main Unit for Development of Northern Sumatra

    Thumbnail
    View/Open
    Cover (1.781Mb)
    Fulltext (8.428Mb)
    Date
    2024
    Author
    Sitorus, Elwis
    Advisor(s)
    Nasution, Fahmi Natigor
    Syahyunan
    Metadata
    Show full item record
    Abstract
    This research is based on the report of budget absorption realization at PT PLN UIP SBU not being absorbed according to the plan. The aim of this study is to identify the main causes of suboptimal budget absorption and to formulate strategies to optimize budget absorption at PT PLN UIP SBU in the future. Analysis of the potential factors causing the failure to achieve the budget absorption target is conducted through discussions and interviews, followed by Likert scale interval analysis of respondent perceptions to determine the main causes of the failure to achieve the budget absorption target. Subsequently, the formulation of the selected strategy uses analysis with the Analytic Hierarchy Process (AHP) method. Based on the research results, the first priority alternative is the standardization of the completeness of budget proposal documents (detailed scope of work, timeline, Bill of Quantities along with references, field survey documentation if needed, and others). The second priority is holding regular periodic meetings with PLN Headquarters regarding budget needs and the bidding process at PLN Headquarters. The third priority is tightening monitoring and risk management evaluation for each project, followed by the fourth priority, which is holding regular meetings on the general plan for procurement unit auctions.
    URI
    https://repositori.usu.ac.id/handle/123456789/101460
    Collections
    • Master Theses (Master of Management) [521]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV