    Model Analisis dan Strategi Mitigasi Risiko Keuangan dalam Pengambilan Keputusan Kelayakan Investasi Pembangunan Pembangkit Listrik Tenaga Air (PLTA) di Wilayah Sumatera Utara

    Analytical and Strategic Model of Financial Risk Mitigation in Decision Making for Investment Feasibility of PLTA (Water Powered Electric Generator) Construction in North Sumatra

    Thumbnail
    View/Open
    Cover (917.2Kb)
    Fulltext (3.889Mb)
    Date
    2024
    Author
    Saloko, Anindityo Aryo
    Advisor(s)
    Sadalia, Isfenti
    Nazaruddin
    Metadata
    Show full item record
    Abstract
    Success in the implementation of a construction project is seen through the accuracy in maintaining the triple constraints: cost, quality, and time. Analyzing project risk is crucial for long-term investment and project development success. It is necessary to have an analysis model for mitigating the risk due to the complexity of constructing a generator project, particularly the 45 MW PLTA (water-powered electric generator) in North Sumatra province. There is the incidence of risk that can impede its construction in the investment financial risk. The following are the risks that will be identified after measurement and analysis are done. It is found that the risk priority is the one which has to be managed first such as the management of project expenses, management of cash and flow, specification of contract detail, and difficulty in supplying the materials. These risks are managed by interpreting them and implementing risk mitigation strategies to prevent financial loss during construction. The analysis on risk mitigation shows that project expense management is the top priority, followed by cash flow management, contract detail specification, and difficulty in supplying the materials. The implementation of the research findings and risk mitigation priorities requires identifying critical processes and adopting approaches to provide alternative controls for these processes. For example, if the total cost approach is critical, then procuring PLTA materials becomes a critical process. An explorative approach, such as contracting with material suppliers to ensure timely delivery of ordered materials (with or without down payment), can be delivered according to the project schedule. Other approaches can be used for other identified critical processes. We can use the result of risk mitigation priority according to risk incidence. The mitigation implementation can be done flexibly according to further identification.
    URI
    https://repositori.usu.ac.id/handle/123456789/101487
    Collections
    • Master Theses (Master of Management) [521]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV