• Login
    View Item 
    •   USU-IR Home
    • Faculty of Public Health
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Public Health
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Penilaian Risiko Keselamatan dan Kesehatan Kerja pada Produksi Crude Palm Oil di PT PSU Tanjung Kasau Tahun 2024

    Occupational Safety and Health Risk Assessment in Crude Palm Oil Production at PT PSU Tanjung Kasau in 2024

    Thumbnail
    View/Open
    Cover (322.0Kb)
    Fulltext (4.942Mb)
    Date
    2025
    Author
    Lubis, Dea Alifiah Salsabilah
    Advisor(s)
    Mahyuni, Eka Lestari
    Metadata
    Show full item record
    Abstract
    PT. Perkebunan Sumatera Utara Tanjung Kasau is a company engaged in the plantation and processing of palm oil that produces CPO (Crude Palm Oil) which is carried out at 6 processing stage stations, where the process at each station involves machines and equipment that can be potentially dangerous for workers. This study aims to determine the assessment of occupational safety and health risks in crude palm oil production at PT Perkebunan Sumatera Utara Tanjung Kasau in 2024. This type of research is observational research with the research objects of production stations at PT Perkebunan Sumatera Utara, namely the TBS receiving station (loading ramp), boiling station (sterilizer), threshing station (bunch press), pressing station (press), clarification station and kernel station (core) using descriptive analytical data analysis methods. The results of this study indicate that the highest possible assessment of CPO production at PT. Perkebunan Sumatera Utara Tanjung Kasau is 4 (most likely to occur), the highest severity assessment is 4 (severe) and the highest risk level assessment is High risk. Risk assessment shows variation in risk level in each production station, namely loading ramp station, sterilizer station, and bunch press have high risk, while press station and clarification station and all stations including kernel, also have low risk. Therefore, it is suggested to improve the bent ladder in the loading ramp section, the company gives warning to workers who do not follow the procedure in using PPE, workers must be more careful about exposure to hot steam during the boiling process, and conduct ear health checks on workers.
    URI
    https://repositori.usu.ac.id/handle/123456789/102149
    Collections
    • Undergraduate Theses [3090]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV