• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Model Estimasi Biaya Konseptual Konstruksi Bangunan Gedung dengan Menggunakan Metode Parametrik (Studi Kasus: Bangunan di Kota Medan dan Sekitarnya)

    Conceptual Cost Estimation Model of Buiding Construction Using Parametric Method (Case Study: Buildings in Medan City and Sorrounding Areas)

    Thumbnail
    View/Open
    Cover (1.137Mb)
    Fulltext (3.374Mb)
    Date
    2025
    Author
    Sinaga, Yogi Thenedy
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    A building is a structure that is built permanently and it’s function is to accommodate the human activities. Building construction begins with initiation stage, in the form of a conception stage based on owner’s projections of the building’s utilization. This conception stage requires a feasibility study to be used as a design development tool or as a cost control tool in the next stage. However, the budget projection in this initial estimate has many limits, one of which is the availability of very little project data, so that the prediction results are usually not very accurate. This study aims to create a model for estimating the total cost of the project (Y) based on the physical parameters of the building available at the initiation stage such as typical floor area (XI) and also the number of floors (X2). This study uses seven building project data that are normalized to the city of Medan and financial year (2024) by considering the construction cost index and the currency inflation rate. The result is a multiple linear regression model, and also a multiple quadratic non-linear regression model. Based on the results obtained through SPSS data analysis, it was found that the multiple linear regression model using two variables has better quality for predicting total costs, with the equation Y= -1,998,706,300 + 5,576,176.4 (X1) + 1,516,269,888 (X2) ± This equation has an R square value of 0.983 so that it can be stated as quite accurate, with a model error percentage of 11 % based on the MAPE value. This model can be used to predict buildings within the range of 1 to 3 floors, and the typical floor area of 167.7 to 1172.3 square meters.
    URI
    https://repositori.usu.ac.id/handle/123456789/102923
    Collections
    • Undergraduate Theses [1512]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV