    Analisa Produktivitas Pekerja Konstruksi Dengan Metode Time Study (Studi Kasus: Proyek Pembangunan Rumah Sakit Murni Teguh Susanna Wesley)

    Analysis of Construction Labour Productivity Using the Time Study Method (Case Study: Murni Teguh Susanna Wesley Hospital Construction Project)

    Thumbnail
    View/Open
    Cover (729.1Kb)
    fulltext (3.705Mb)
    Date
    2025
    Author
    Sihite, Herijoy Christian
    Advisor(s)
    Syahizal
    Metadata
    Show full item record
    Abstract
    Worker productivity is a critical factor in ensuring the successful implementation of a construction project schedule, as it directly impacts the alignment between the planned construction timeline and actual field progress. Column and beam work, being part of critical project activities, requires a thorough productivity analysis. This research aims to analyze worker productivity in column and beam construction and identify the key factors influencing productivity in the Murni Teguh Susanna Wesley Hospital construction project. Productivity calculations were conducted using the Time Study method, which is a work measurement technique that determines the Standard Time required for a specific task. The Standard Time is derived through direct observation, where the Basic Time is recorded and processed to obtain the Standard Time, which is then used to compute productivity values. The results of the productivity calculations indicate that the labor productivity for formwork installation in columns and beams is 16.94 m²/OH and 29.11 m²/OH, respectively. Meanwhile, for reinforcement installation, productivity values for columns and beams are 196.50 kg/OH and 267.25 kg/OH, respectively. For concrete casting, the productivity values for columns and beams are 3.68 m³/OH and 13.64 m³/OH, respectively. The analysis of productivity data reveals that several factors influence worker productivity in column and beam construction. These factors include material placement, complexity of reinforcement design, work location, number of workers, relaxation allowances, type of materials used, and the utilization of equipment. Understanding these factors can help optimize labor efficiency and improve overall project performance.
    URI
    https://repositori.usu.ac.id/handle/123456789/103075
    Collections
    • Undergraduate Theses [1512]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV