    Analisis Faktor-Faktor Kendala Penyebab Nonexcusable Delay dalam Penerapan Manajemen Waktu pada Proyek Pembangunan Gedung Islamic Center

    Analysis of Constraining Factors Causing Nonexcusable Delay in the Application of Time Management in the Islamic Center Building Construction Project

    Thumbnail
    View/Open
    Cover (1.856Mb)
    Fulltext (3.928Mb)
    Date
    2024
    Author
    Simanullang, Luan Michelle Br
    Advisor(s)
    Tarigan, Johannes
    Metadata
    Show full item record
    Abstract
    Delays in construction projects result in an extension of the scheduled project completion period as specified in the contract agreement. Not completing a project on time shows a lack of productivity and will certainly result in financial waste. One of the most important factors in project success is the existence of proper project time management. Based on the category of causes of delays, this study specifically discusses non-excusable delays, where the contractor holds full responsibility for the delays that occur in the project. The purpose of this study is to find out the factors that can be the cause of non-excusable delay and to find out the most dominant factors that can be the cause of non-excusable delay in the application of time management carried out in the Islamic Center Building Construction project. The data was analyzed using the Statistical Program for Social Science (SPSS) program. The results of the study showed that there were 12 variables that could be factors that could be the cause of non-excusable delay where there were 7 factors with the most influential category that affected at least 58,895% of the total factors causing delay and 5 factors with a fairly influential category that affected around 9,137% of the delay factors.
    URI
    https://repositori.usu.ac.id/handle/123456789/103564
    Collections
    • Undergraduate Theses [1512]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV