dc.contributor.advisor | Tarigan, Johannes | |
dc.contributor.author | Tarigan, Nicky Arbenta | |
dc.date.accessioned | 2025-05-02T08:25:56Z | |
dc.date.available | 2025-05-02T08:25:56Z | |
dc.date.issued | 2024 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/103567 | |
dc.description.abstract | Project success is the main target for all construction project work. Every
project must have factors that affect the success of the project, but not all projects
have the same critical success factors. Because the work process and problems in
the field are different in each construction project implementation. Therefore, the
right strategy must be prepared by the project parties according to the circumstances
of their respective projects.
The purpose of this study is to identify the factors that affect the success of
the project (critical success factors) in the revitalization of the Medan independent
field. The research method used was multiple linear regression analysis using
questionnaire data filled out by 15 respondents. The respondents are contractors
who are selected based on the organizational structure of the project. The
questionnaire contains 4 independent variables and 1 bound variable, each variable
contains 3 statements.
Of all the statements from the variables, including project management
variables, labor variables, equipment and material variables, external variables, and
project success variables. All statements in these variables are declared valid and
reliable.
The results of the multiple linear regression analysis in the SPSS 2.7
application show that the factors that most affect project success are the labor
variable (42.6%), then the equipment and material variable affects (36.1%) and the
last is the project management variable (29.4%). | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | project success | en_US |
dc.subject | construction project | en_US |
dc.subject | multiple linear regression analysis | en_US |
dc.title | Faktor – Faktor yang Mempengaruhi Kesuksesan Pelaksanaan Proyek Konstruksi (Studi Kasus : Proyek Revitalisasi Lapangan Merdeka Medan) | en_US |
dc.title.alternative | Factors Affecting the Succesful Implementation of Construction Projects (Case Study: Revitalisation Project of Lapangan Merdeka Medan) | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM200404124 | |
dc.identifier.nidn | NIDN0024125605 | |
dc.identifier.kodeprodi | KODEPRODI22201#Teknik Sipil | |
dc.description.pages | 92 Pages | en_US |
dc.description.type | Skripsi Sarjana | en_US |
dc.subject.sdgs | SDGs 9. Industry Innovation And Infrastructure | en_US |