• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Perbaikan Sistem Perawatan Mesin Digester Menggunakan Metode Failure Mode Effect Analysis (FMEA) dan Reliability Centered Maintenance (RCM) pada PKS Pagar Merbau

    Proposal for Improving the Digester Machine Maintenance System Using the Failure Mode Effect Analysis (FMEA) and Reliability Centered Maintenance (RCM) Methods at Pagar Merbau Palm Oil Mill

    Thumbnail
    View/Open
    Cover (503.4Kb)
    Fulltext (4.713Mb)
    Date
    2024
    Author
    Manurung, Ferdinand Kenan
    Advisor(s)
    Napitupulu, Humala Lodewijk
    Metadata
    Show full item record
    Abstract
    PKS Pagar Merbau is one of the factories owned by PTPN II that produces CPO. This study was conducted on the factory's machine with the highest frequency of breakdowns, the digester machine. The current maintenance policy is only corrective maintenance, where repairs are made only when a machine is broken. This results in sudden machine failures, decreased reliability, and significant downtime, leading to time and cost losses due to production delays. The study aims to propose improvements to the maintenance system by implementing preventive maintenance on the digester machine using the Reliability Centered Maintenance and Failure Mode Effect Analysis methods. The expected outcome is to prevent machine failures, thus improving machine reliability. The critical components of the digester machine, identified as the ones with the highest failure frequency, are the bearing, v-belt, and electric motor. Five preventive maintenance policies were proposed: scheduled restoration tasks for worn bearings, scheduled discard tasks for cracked bearings and the v-belt, and scheduled restoration and discard tasks for noisy and failed electric motors, respectively. The implementation of preventive maintenance using the RCM method resulted in a replacement schedule for the digester's critical components: bearings every 67.45 days, v-belts every 67.68 days, and electric motors every 40.53 days.
    URI
    https://repositori.usu.ac.id/handle/123456789/104006
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV