• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Mechanical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Mechanical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Efektifitas Mesin Penggiling Tebu di Pabrik Gula Menggunakan Metode Overall Equipments Effectiveness

    Analysis of the Effectiveness of Sugar Cane Grinding Machines in Sugar Factories Using the Overall Equipment Effectiveness Method

    Thumbnail
    View/Open
    Cover (2.101Mb)
    Fulltext (3.144Mb)
    Date
    2024
    Author
    Abadan, Khoirul Nur
    Advisor(s)
    Ariani, Farida
    Metadata
    Show full item record
    Abstract
    The purpose of TPM is to determine the six big losses in the production machine. Overall Equipment Effectiveness (OEE) is used as a measuring tool in the implementation of Total Productive Maintenance (TPM) in the Sugar Factory. The analysis of this sugarcane grinding machine is measured through availability, performance efficiency and rate of quality product and determining the critical components of the sugarcane grinding machine. Sugar factories often experience machine damage during the production process which results in downtime for too long so that machine performance becomes less effective, machine damage is caused by a lack of proper and correct machine maintenance. The purpose of this study is to assess the effectiveness of the sugarcane grinding machine using the Overall Equipment Effectiveness (OEE) method which can maintain the machine ideally by making repairs to several losses that occur in the machine. The results showed that the average value of the effectiveness of the sugarcane grinding machine using the Overall Equipment Effectiveness (OEE) method was 63%. The OEE value obtained did not comply with the standards set by the Japan Institute of Plant Maintenance (JIPM) which was 85%. The OEE value was low because the value of the performance ratio of 79% did not comply with the JIPM standard of 95%. The results of the analysis of the Six Big Losses that occurred in the sugarcane grinding machine showed that idling and minor stoppages of 18.95% and Reduced Speed Loss of 18.67% had the highest percentage of the other six losses. This is what affects the low performance rate value so that improvements are made.
    URI
    https://repositori.usu.ac.id/handle/123456789/104251
    Collections
    • Undergraduate Theses [899]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV