• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Rancang Bangun Pembangkit Listrik Tenaga Uap Dengan Bahan Bakar Pelepah Sawit Menggunakan Turbin Pelton (Studi Kasus Pada Desa Huta Padang Kabupaten Asahan)

    Design And Construction Of A Steam Power Plant Fueled By Oil Palm Fronds Using A Pelton Turbine (Case Study In Huta Padang Village Asahan Regency)

    Thumbnail
    View/Open
    Cover (645.5Kb)
    Fulltext (8.215Mb)
    Date
    2025
    Author
    Manullang, Timothy Andrew
    Advisor(s)
    Mubarakah, Naemah
    Bukit, Ferry Rahmat Astianta
    Metadata
    Show full item record
    Abstract
    Indonesia has significant potential for renewable energy resources, one of which comes from waste. Indonesia has a biomass waste potential of 885.2 million Gigajoules (GJ) per year. This opens up opportunities for utilizing biomass, such as oil palm waste, as an energy source. Huta Padang, located in Bandar Pasir Mandoge Subdistrict, Asahan Regency, North Sumatra, is predominantly filled with oil palm plantations, which produce oil palm frond waste daily. This study aims to utilize the oil palm frond waste generated daily by the community by designing a boiler to generate electricity through the heat produced by burning the oil palm frond waste, specifically a steam power plant with a Pelton turbine. This system will generate electrical energy from a DC generator driven by a turbine powered by steam produced by a boiler that is fueled by palm frond waste. The testing will be conducted three times for each specified condition. Based on the test results with a load variation of 1 lamp of 30 watts, the obtained mean value of the data showed a generator speed of 1445,8 RPM, voltage of 15,71 V, current of 1,14 A, and the highest power of 18,1 W at a pressure of 7 bar. Meanwhile, with a load variation of 2 lamps of 30 watts, the generator speed was 1238,9 RPM, voltage was 12,04 V, current was 1,03 A, and the power output was 12,4 W at a pressure of 7 bar.
    URI
    https://repositori.usu.ac.id/handle/123456789/104376
    Collections
    • Undergraduate Theses [1460]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV