• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Master Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Master Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prioritas Penanganan Jalan Nasional dengan Menggunakan Metode AHP dan ANP: Ruas Jalan BTS. Tapteng/Tapsel – Batang Toru – BTS. Kota Sidempuan

    View/Open
    Fulltext (4.365Mb)
    Date
    2022
    Author
    Putra, T. Rahmatsyah
    Advisor(s)
    Mulia, Ahmad Perwira
    Hasibuan, Gina Cynthia Raphita
    Metadata
    Show full item record
    Abstract
    The budget constraint in managing the condition of the pavement causes the government to compile a priority ranking of the roads to be handled. Each decision-maker has a different assessment for each criterion that is considered in determining road priorities. These problems require a common perception of decision-makers in determining road preservation priorities. Priority determination with more than one criteria can be done using Multi-Criteria Decision Making (MCDM) analysis. Furthermore, the alternative methods of MCDM analysis that are commonly used are the Analytic Hierarchy Process (AHP) and the Analytic Network Process (ANP). This research tries to get priority in handling Bts. Tapteng/Tapsel – Batang Toru – Bts. Kota Sidempuan road segment uses the AHP and ANP methods. The criteria used are traffic volume, traffic load, level of road damage, government policies, handling costs, and area development. The segmentation of the road segment is applied in this study into 9 sub-sections to obtain a uniform alternative length of the road. The results showed that there were differences in the weight of the criteria but had the same priority order. The most influential criteria in road handling using the AHP method are traffic volume (0.330), followed by traffic load (0.221), policies (0.151), costs (0.144), road conditions (0.111), and area development (0.041). Meanwhile, in the ANP method, the criteria with the largest weight are traffic volume (0.268), followed by traffic load (0.185), policies (0.167), costs (0.166), road conditions (0.137), and area development (0.077). The results of the two methods also show the priority of road handling sections which tend to be different. The results of the ANP method are expected to be a more objective priority due to the consideration of feedback on the elements and clusters themselves.
    URI
    https://repositori.usu.ac.id/handle/123456789/53684
    Collections
    • Master Theses [246]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV