• Login
    View Item 
    •   USU-IR Home
    • Faculty of Economics and Business
    • Department of Management
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Economics and Business
    • Department of Management
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Beban Kerja dalam Penentuan Jumlah Staf Divisi Teknik dan Divisi Pengembangan pada PT X

    View/Open
    Fulltext (3.646Mb)
    Date
    2022
    Author
    Alvin, Alvin
    Advisor(s)
    Nazaruddin, Nazaruddin
    Sembiring, Meilita Tryana
    Metadata
    Show full item record
    Abstract
    Workload is a process done by a person in accomplishing the tasks and obligation in a job or position group in a normal situation in a special term. The research is done in a company operating in loading and unioading container service where there is the imbalance in the ratio of overtime caused by the allocation of employees in each division which is not based on work load. In this research workload analysis is done in the staffs with relatively high ratio of overtime in the technique division of 254.6 hours/person and in the development division of 260.3 hours/person. The objective of the research is to analyze employees' working time by using work sampling technique and balancing workload by analyzing the need for employees in both divisions, using full time equivalent. The result of the research shows that the effective work days in a year are 234 days and the effective working time is 1 310 hours for five work days per week. From the work sampling, it is found that in the technique division, the number of productive activity observations is 76.24%, non-productive activity was 5.68%, and personal activity is 18.08% with the allowance of 30%. in the development division, the number of productivity activity observations is 76.63%, non-productive activity is 5.17%, and personal activity is 18.20% with the allowance of 30%. Based on the measurement of workload in the technique division with fall time equivalent method it is found that there are employees with under load, unload, and overload workload while in the development division there are employees with only overload workload.
    URI
    https://repositori.usu.ac.id/handle/123456789/54660
    Collections
    • Undergraduate Theses [4421]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV