Proses Peleburan Aluminium Dalam Tungku Reduksi pada Pt. Inalum Kuala Tanjung BatubaraProses Peleburan Aluminium Dalam Tungku Reduksi pada Pt. Inalum Kuala Tanjung Batubara
| dc.contributor.advisor | Bangun, Nimpan | |
| dc.contributor.author | Putra, Jefri Ardiansyah | |
| dc.date.accessioned | 2022-12-09T04:09:11Z | |
| dc.date.available | 2022-12-09T04:09:11Z | |
| dc.date.issued | 2010 | |
| dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/71903 | |
| dc.description.abstract | To produce liquid aluminium from row material alumina (Al2O3), Therefore alumina was processed in several steps electrolysed using done Hall-Harould methode. Data analysis on the processes of aluminium by using current 190 kA, temperature 955oC, current efficiency 0,923 %, voltage between 4,20-4,30 v, and the total operation of pot is 504 units was shown, will produce 1,3 tons aluminium per day. Universitas | en_US |
| dc.language.iso | id | en_US |
| dc.publisher | Universitas Sumatera Utara | en_US |
| dc.title | Proses Peleburan Aluminium Dalam Tungku Reduksi pada Pt. Inalum Kuala Tanjung BatubaraProses Peleburan Aluminium Dalam Tungku Reduksi pada Pt. Inalum Kuala Tanjung Batubara | en_US |
| dc.type | Thesis | en_US |
| dc.identifier.nim | NIM072409014 | |
| dc.identifier.nidn | NIDN8836140017 | |
| dc.identifier.kodeprodi | KODEPRODI47401#Kimia | |
| dc.description.pages | 38 Halaman | en_US |
| dc.description.type | Kertas Karya Diploma | en_US |
Files in this item
This item appears in the following Collection(s)
-
Diploma Papers [1126]
Kertas Karya Diploma

