• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem On-Grid pada Rumah Sakit Umum PTPN II Tanjung Selamat Langkat Sumatera Utara

    View/Open
    Fulltext (3.955Mb)
    Date
    2023
    Author
    Yaasin, Muhammad Irfan
    Advisor(s)
    Suherman
    Bukit, Ferry Rahmat Astianta
    Metadata
    Show full item record
    Abstract
    Utilization of New and Renewable Energy Through the construction of rooftop solar power plants (PLTS) is one form of encouraging Indonesia to achieve Net Zero Emissions by 2060. This aimed at reducing indonesia’s dependence on the use of reduce Greenhouse Gas (GHG) emissions and achieve energy independence in the future. The Tanjung Selamat general hospital is one of PTPN II subsidiaries engaged in the health service sector which located in 13.56 ha of land and is considered to have the potential for PLTS utilization. In this study, an analysis was carried out using a Helioscope simulation to see the amount of energy that can be generated through the utilization of the building’s roof area and to calculate how much cost is required for the installation of 3 schemes, namely utilizing the entire roof of the building, maximizing the installed power capacity of PLN and utilizing a portion of the existing roof area. From the results of research using solar modules of the type Jinko Solar 72HL4 with a capacity of 550 Wp, a total energy potential that can be generated is 451.9 MWh/year using 669 solar modules and 3 inverter units with a total investment value of Rp. 4.062.941.762 for the scheme to maximize PLN’s installed power capacity, the energy potential generated is 231,5 MWh/year using 340 solar modules and 2 inverter units with an investment value of Rp. 3.364.450.000 and 42.48 MWh/year from the scheme utilizing a portion of the building’s roof area using 60 solar modules and 2 inverter units with a total investment of Rp. 594.648.251.
    URI
    https://repositori.usu.ac.id/handle/123456789/83565
    Collections
    • Undergraduate Theses [1470]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV