• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimasi Skema Pelepasan Beban pada Sistem Distribusi Terhubung Distributed Generation (Dg) dalam Mode Operasi Islanding Menggunakan Multi Objective Artificial Bee Colony (Moabc) (Aplikasi pada Sistem Ieee 33 Bus)

    View/Open
    Fulltext (2.874Mb)
    Date
    2023
    Author
    Sinaga, Mikolas Johan Untung
    Advisor(s)
    Pane, Zulkarnaen
    Metadata
    Show full item record
    Abstract
    Overload disturbance is one of the problems in the electricity distribution system which can trigger the system to a voltage collapse condition. In distribution systems that are connected to Distributed Generation (DG), one of the causes of overload is the release of the Grid due to loss of excitation, in this condition the system can still work by relying solely on supply from DG. This system condition is called a separate isolation system or Islanding operation mode, but the DG capacity is not sufficient to supply all the required load capacity, so it is necessary to release a number of loads. A proper load shedding technique is required so that the system only discharges as little load as possible to prevent the system from collapsing. In this thesis, the authors carry out a load shedding simulation on an IEEE 33 Bus system connected to 3-DG units, using the intelligent UVLS load shedding technique with Multi Objective Artificial Bee Colony optimization in MATLAB software and compare it with conventional UFLS techniques. By comparing the transient analysis of the two load shedding techniques in the ETAP software, it is found that in the Islanding A operation mode the intelligent UVLS technique can restore the system in 15.031 seconds by releasing 1,729 kW of load compared to the conventional UFLS technique which requires 28.286 seconds by releasing 1,875 kW, and at Islanding B operating mode conventional UFLS technique can restore the system in 22.491 seconds by releasing 390 kW load compared to conventional UFLS technique which requires 28.871 seconds by releasing 470 kW
    URI
    https://repositori.usu.ac.id/handle/123456789/85653
    Collections
    • Undergraduate Theses [1465]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV