• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Master Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Master Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Penerapan Metode Analytical Hierarchy Process (AHP) Dalam Penentuan Prioritas Pembangunan Jembatan Rangka di Kabupaten Deli Serdang

    View/Open
    Fulltext (3.768Mb)
    Date
    2023
    Author
    Br. Simanjuntak, Marlina
    Advisor(s)
    Mulia, Ahmad Perwira
    Hasibuan, Gina Cynthia Raphita
    Metadata
    Show full item record
    Abstract
    Bridges as an important part of the transportation system have a role in spurring economic growth and regional development. For this reason, the government is obliged to build bridge infrastructure in a stable condition so that connectivity between regions can be achieved. Given the many infrastructure development activities that have been delayed since 2019 due to refocusing and reallocation and the limitations of the Deli Serdang District revenue and expenditure in 2022, it is necessary to select the order of priority for the bridge implementation program. This study aims to analyze the dominant criteria and sub criteria that need to be considered so that the order of priority for the construction of a truss bridge in Deli Serdang Regency can be compiled. This study uses the Analytical Hierarchy Process (AHP) and TOPSIS method. The sampling technique used was purposive sampling. The selected respondents are stakeholders in road and bridge construction program with a total of 10 respondents. The criteria considered in this study include: i) economic (construction costs), ii) technical (sub-criteria are bridge age, bridge length, bridge width, and implementation time), iii) land use (sub-criteria are agriculture/plantation, tourism, fisheries, and mining), iv) accessibility (sub-criteria are distance and time), v) social and regional development (sub-criteria are population, social facilities, government facilities, and regional development), and iv) policy (the sub criteria are development planning deliberations, reses/ the main idea of the regional people’s representative council, and stakeholders). The results showed that the dominant criteria that need to be considered are social and regional development with an average weight value of 0.31. While the dominant sub-criteria is the population with a global average weight of 0.15. The order of priority for the construction of the truss bridge is the Sei Belawan Bridge in Tanjung Anom Village as the first priority, the Lau Cirem Bridge in Perpanden Village as the second priority, and the Sei Serdang Bridge in Negara Beringin Village as the third priority.
    URI
    https://repositori.usu.ac.id/handle/123456789/85957
    Collections
    • Master Theses [246]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV