• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Optimasi Pemilihan Lokasi Prioritas Pemasangan LBS Menggunakan Metode ANP-TOPSIS (Studi Kasus: PT. PLN UP2D Sumatera Utara)

    View/Open
    Fulltext (2.351Mb)
    Date
    2023
    Author
    Sitorus, Sehat Gabe
    Advisor(s)
    Hasan, Syafruddin
    Metadata
    Show full item record
    Abstract
    PT. PLN UP2D North Sumatra is responsible for maintaining a stable and efficient supply of electricity in North Sumatra. PT. PLN UP2D North Sumatra uses work success indicators such as Energy Not Served (ENS), System Average Interruption Duration Index (SAIDI), and System Average Interruption Frequency Index (SAIFI) to increase system reliability. Based on the Company's Work Plan and Budget (RKAP) for 2023, PT.PLN UP2D North Sumatra will install 150 new Load Break Switch (LBS) units in 5 UP3. However, in previous years the decision making regarding the spread of LBS and determining the priority of feeders had not used a clear and tested method. This study uses the Analytic Network Process (ANP) method and the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) as optimization in decision making to determine the priority of feeders. This study also involved 397 alternative feeders with a plan to install 150 LBS units. There are seven criteria used in the installation of the LBS, including ENS, SAIDI, SAIFI, feeder load, network length, frequency of interruptions, and number of customers. The results of the study concluded that the 124 feeders with the highest performance scores would be prioritized to install 150 new LBS units. Thus, the application of the ANP-TOPSIS method was successful in optimizing decision making in determining priority feeders to install new LBS
    URI
    https://repositori.usu.ac.id/handle/123456789/87843
    Collections
    • Undergraduate Theses [1465]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV