• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Civil Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisa Percepatan Proyek dengan Menggunakan Metode Crashing (Studi Kasus: Proyek Pembangunan Pabrik Kelapa Sawit)

    Thumbnail
    View/Open
    Cover (655.4Kb)
    Fulltext (2.616Mb)
    Date
    2023
    Author
    Kurniawan, Eki
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    A construction project is an activity or work that is only carried out temporarily and generally has a short period of time. In the process of working on the project, many parties are involved both directly and indirectly. Working relationships and functional relationships involve all parties involved. In the implementation of construction projects various things can occur that can cause an increase in implementation time so that project completion becomes slower than the planning target. Delays in project work can be anticipated by accelerating its implementation, but must still pay attention to cost and quality factors. Crashing is a method to shorten the length of project time by analyzing alternatives in the work network with the aim of optimizing work time at minimal cost. The application of the crashing method to the PT Karya Agung Megah Utama Palm Oil Mill Construction project, Lubuk Basung, West Sumatra aims to determine the optimum duration obtained with the alternative of adding working hours (overtime) or adding labor to anticipate delays that occur in the project. The work that will be crashed is the activity found on the critical path, then the slope calculation will be carried out, then the work activity analysis is carried out using the crashing method. From this crashing analysis, the results are obtained, namely the addition of labor obtained a total labor wage of Rp. 24,460,586.09 and a total project work duration of 17 working days, 15% faster than the normal duration. While in the addition of overtime working hours the total wage obtained is Rp. 42,926,917.63 and the total duration of project work becomes 14 working days, 30% faster than the normal duration.
    URI
    https://repositori.usu.ac.id/handle/123456789/88893
    Collections
    • Undergraduate Theses [1513]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV