• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Margarin dari Crude Palm Oil Menggunakan Proses Interesterifikasi Enzimatik dengan Kapasitas Produksi 9.800 Ton/Tahun dan Tugas Khusus Rancangan Keteknikan Detail Kristalizer

    Thumbnail
    View/Open
    Cover (1.391Mb)
    Fulltext (4.745Mb)
    Date
    2023
    Author
    Damanik, Petro Dasma Karunia
    Advisor(s)
    Maulina, Seri
    Metadata
    Show full item record
    Abstract
    Margarine is a water-in-oil type emulsion comprising of at least 80% lipid phase and the rest are other ingredients such as water, salt, lecithin, flavorings, dyes, and vitamin A. Margarine has uses as a cooking medium, making cakes and cookies, and add flavor. This preliminary design of margarine plant is designed with production capacity 9.800 ton/year using the main raw material Crude Palm Oil (CPO) and Refined Bleached Deodorized Palm Kernel Oil (RBDPKO). The location in this preliminary plant design is planned to be in Padang Hilir District, Tebing Tinggi City, North Sumatera Province with a land area of 12.204 m2. The company form is a Limited Liability Company (PT) using a line and staff organizational structure and 127 employees. Water needs in this preliminary plant design are obtained from Padang River, Tebing Tinggi with a total water requirement of 17.034,315 kg/hour. Based on the results of economic analysis, obtained: 1. Total Capital Investment = IDR 469.632.523.362,91 2. Total Production Cost = IDR 425.509.792.337,64 3. Sales Result = IDR 597.657.068.261,00 4. Net Profit = IDR 106.606.942.882,76 5. Profit Margin (PM) = 17,837 % 6. Break Even Point (BEP) = 55,08 % 7. Return on Investment (ROI) = 22,70 % 8. Pay Out Time (POT) = 4,089 years 9. Return on Network (RON) = 37,833 % 10. Internal Rate of Return (IRR) = 31,652 % Based on the results of economic analysis, it can be concluded that this margarine plant from CPO is feasible to established.
    URI
    https://repositori.usu.ac.id/handle/123456789/89043
    Collections
    • Undergraduate Theses [1176]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV