• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Pembuatan Biochar dari Bahan Baku Tempurung Kelapa Menggunakan Proses Pirolisis Lambat dengan Kapasitas Produksi 54.000 Ton/Tahun dan Tugas Khusus Optimalisasi Pemanfaatan Energi dari Heat Exchanger Menuju Rotary Dryer

    Thumbnail
    View/Open
    Cover (711.1Kb)
    Fulltext (5.844Mb)
    Date
    2023
    Author
    Anastasia, Eunike
    Advisor(s)
    Sarah, Maya
    Metadata
    Show full item record
    Abstract
    This biochar production plant from coconut shell with slow pyrolysis process hasa capacity of 54,000 tonnes/year and operates for 330 days a year. The amount of coconut shell required to achieve the annual production capacity is 169,021 tonnes/year. The specific task completed was the optimisation of energy utilisation from the heat exchanger to the rotary dryer. With the target of process integration, providing maximum feasible heat recovery. Fuel savings from optimising energy utilisation is 99.764%. By reducing the use of fuel by 99.972% through optimisation of heat utilisation from the heat exchanger (E-201) to the rotary dryer (DE-101) provides savings on operational costs for the drying process of coconut shell raw materials of Rp.378,860,000 to dry coconut shell raw materials of 21,597.228 kg / hour. The biochar manufacturing plant is planned to be located in Indragiri Hilir Regency, Riau. The land area required is 10,045.2 m2. With the planned form of business entity is a Limited Liability Company (PT). The planned form of organisation is a line organisation form with the number of workers required as many as 121 people. The results of the economic aspect analysis obtained are as follows:  Capital Investment (CI) = Rp. 566,599,279,669  Total Cost (TC) = Rp. 881,389,117,535  Profit Margin (PM) = 15.862%  Break Even Point (BEP) = 30.042%  Return On Investment (ROI) = 21.333%  Pay Out Time (POT) = 5.179 years  Internal Rate of Return (IRR) = 19.380% Based on the results of the economic analysis, it can be concluded that the biochar manufacturing plant from coconut shell with slow pyrolysis process is feasible to be established.
    URI
    https://repositori.usu.ac.id/handle/123456789/89175
    Collections
    • Undergraduate Theses [1176]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV