• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Tingkat Kebutuhan dan Upaya Pengembangan SPAM dan Pengembangan Jaringan di Kecamatan Hamparan Perak

    Thumbnail
    View/Open
    Cover (1.804Mb)
    Fulltext (2.563Mb)
    Date
    2023
    Author
    Anfasa, M. Ihza
    Advisor(s)
    Husin, Amir
    Faisal, Muhammad
    Metadata
    Show full item record
    Abstract
    To find out the potential for developing water treatment units at the Hamparan Perak IPA Water Treatment Plant and to determine the development of the Hamparan Perak service area (IPA), and to find out the availability of raw water capacity of PDAM Tirta Deli in Hamparan Perak District, Deli Serdang Regency with a SPAM development plan. So it is necessary to do a research, namely by analyzing primary data which will be included in a population projection and water demand projection, as well as analyzing the existing network and network development using the EPANET 2.0 application. Based on the results of the analysis that has been carried out, it is obtained that the number of people who reached 100,000 people in 2019 was 95,306 with a production capacity of 60 liters/second, PDAM Tirta Deli unit Hamparan Perak District is still able to serve customers with service targets at the end of the projected year reaching 48% or totaling 116,350 soul. In Hamparan Perak District, the total water demand is 67,127 m3/month with 3,197 house connections and if averaged, the water demand for each customer is 21 m3/month. After projecting water demand for 100% service coverage with a production capacity of 60 liters/second, that is until 2026 with a total water demand of 55.50 liters/second. And the result of the execution of the EPANET program is a success, where water flows throughout the customers served. The results show that the highest pressure value is 23.80 meters and the lowest pressure value is 10.28 meters. The drainage system uses a pump and the existing distribution pipe has a size of 150 mm for the primary pipe, 100 mm for the secondary pipe and 50 mm for the tertiary pipe with PVC (Polyvinyl Chloride) pipe type.
    URI
    https://repositori.usu.ac.id/handle/123456789/89262
    Collections
    • Undergraduate Theses [381]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV