dc.description.abstractA construction project always tries for the project to be completed on time without any delays or cost overruns. But in fact, in the implementation of construction projects there are often discrepancies between the planned schedule and the reality on the project site. This is what causes concerns about whether the time planned is already optimal or not. As in the case with the project which is the object of this study, it encounter delays caused by unstable soil. Therefore, this delay can be anticipated by optimizing using the Least Cost Analysis method. The aim of this study using the Least Cost Analysis method is to determine the optimum total cost and project duration by applying the Least Cost Analysis method and to find out the comparison of the budget estimated plan with analysis after using the Least Cost Analysis method. Based on the results of the analysis carried out on the structural work for the BCA Building Construction Project in Tebing Tinggi with a normal duration of 177 days and subcontractor contract price to the main project contractor is Rp1.723.850.000 after accelerating time and costs using the Critical Path Method (CPM) and the Least Cost Analysis method project duration become 168 days and the project cost become Rp1.718.541.514,84. With a presentation of a time reduction of 5,08% and presentation of a costs reduction of 0,31% from estimated plan. The comparison of normal costs with costs after being accelerated using the Least Cost Analysis method is Rp5.308.495,16.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectLeast Cost Analysisen_US
dc.subjectCritical Path Method (CPM)en_US
dc.subjectOptimal Durationen_US
dc.subjectOptimal Costen_US
dc.subjectOptimizationen_US
dc.subjectSDGsen_US
dc.titleOptimalisasi Waktu dan Biaya Pelaksanaan Proyek Menggunakan Metode Least Cost Analysis (Studi Kasus: Proyek Pembangunan Gedung BCA di Tebing Tinggi)en_US
dc.typeThesisen_US
dc.identifier.nimNIM190404103
dc.identifier.nidnNIDN0031126118
dc.identifier.kodeprodiKODEPRODI22201#Teknik Sipil
dc.description.pages92 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record