Show simple item record

dc.contributor.advisorTambunan, Mangara Mangapul
dc.contributor.authorChristian, Binsardo
dc.date.accessioned2024-02-12T03:14:15Z
dc.date.available2024-02-12T03:14:15Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/91070
dc.description.abstractPT. Anugrah Karya Aslindo is a company engaged in manufacturing that produces springbed mattresses. On the production floor of PT. Anugrah Karya Aslindo has a weakness, namely the long distance between departments. From the Foaming Department to the Semi-Finished Material Warehouse is 162 meters, the distance from the Raw Materials Department to the Foaming Department is 166 meters. The distance from the Raw Materials Department to the Sewing Department is 69 meters. This of course will cause the cost of moving materials to be large. The method used to solve this problem is to use Systematic Layout Planning and the BLOCPLAN algorithm. The results showed that there was a change in the total moment of displacement of 1.579 meters/month and an increase in the efficiency of material flow to 48% with a cost savings of Rp1.773.782.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectBLOCPLANen_US
dc.subjectFacility Layouten_US
dc.subjectMaterial Handling Costen_US
dc.subjectSystematic Layout Planningen_US
dc.subjectSDGsen_US
dc.titlePerancangan Ulang Tata Letak Fasilitas Produksi Dengan Menggunakan Systematic Layout Planning Dan Algoritma Blocplan Pada Pt. Anugrah Karya Aslindoen_US
dc.typeThesisen_US
dc.identifier.nimNIM170403107
dc.identifier.nidnNIDN0010105507
dc.identifier.kodeprodiKODEPRODI26201#Teknik Industri
dc.description.pages105 Halamanen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record