dc.contributor.advisor | Tambunan, Mangara Mangapul | |
dc.contributor.author | Christian, Binsardo | |
dc.date.accessioned | 2024-02-12T03:14:15Z | |
dc.date.available | 2024-02-12T03:14:15Z | |
dc.date.issued | 2023 | |
dc.identifier.uri | https://repositori.usu.ac.id/handle/123456789/91070 | |
dc.description.abstract | PT. Anugrah Karya Aslindo is a company engaged in manufacturing that
produces springbed mattresses. On the production floor of PT. Anugrah Karya
Aslindo has a weakness, namely the long distance between departments. From the
Foaming Department to the Semi-Finished Material Warehouse is 162 meters, the
distance from the Raw Materials Department to the Foaming Department is 166
meters. The distance from the Raw Materials Department to the Sewing Department
is 69 meters. This of course will cause the cost of moving materials to be large. The
method used to solve this problem is to use Systematic Layout Planning and the
BLOCPLAN algorithm. The results showed that there was a change in the total
moment of displacement of 1.579 meters/month and an increase in the efficiency of
material flow to 48% with a cost savings of Rp1.773.782. | en_US |
dc.language.iso | id | en_US |
dc.publisher | Universitas Sumatera Utara | en_US |
dc.subject | BLOCPLAN | en_US |
dc.subject | Facility Layout | en_US |
dc.subject | Material Handling Cost | en_US |
dc.subject | Systematic
Layout Planning | en_US |
dc.subject | SDGs | en_US |
dc.title | Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Menggunakan Systematic Layout Planning Dan Algoritma Blocplan Pada Pt. Anugrah Karya Aslindo | en_US |
dc.type | Thesis | en_US |
dc.identifier.nim | NIM170403107 | |
dc.identifier.nidn | NIDN0010105507 | |
dc.identifier.kodeprodi | KODEPRODI26201#Teknik Industri | |
dc.description.pages | 105 Halaman | en_US |
dc.description.type | Skripsi Sarjana | en_US |