Evaluasi Rancangan Elevasi Tinggi Muka Air pada Jembatan Tol Sei Wampu di Kawasan Sungai Sei Wampu

Date
2023Author
Sinaga, Marta Uli
Advisor(s)
Indrawan, Ivan
Sembiring, Robi Arianta
Metadata
Show full item recordAbstract
One of the problems that often occurs at the project location is the problem
of overflowing river water which causes flooding, including around the
construction of the Sei Wampu TOL bridge where the biggest problem is floods
that overflow when it rains, so that the construction of the TOL bridge on the Sei
Wampu River requires calculations. The planned flood discharge and water level
will influence the planning of the bridge structure. The data is then processed using
hydrological analysis and hydraulic analysis. Hydrological analysis includes
calculating regional rainfall using the Polygon Thiessen method, analyzing rain
distribution using Log Pearson Type III, calculating rain intensity and flood
discharge using the HSS Nakayasu method. Meanwhile, hydraulic analysis uses
HEC-RAS (Hydrology Engineering Center-River Analysis System) 5.0 supporting
software to calculate the water level elevation value on the Sei Batang Panggang
Toll Bridge in the Sei Batang Panggang River Area. From the results of the analysis,
rainfall and flood discharge values were obtained at return periods of 2, 5, 10, 25
and 50 years and it was found that the existing water level elevation value did not
exceed the flood water level value (TMA<MAB)