• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Penerapan Lean Manufacturing untuk Meminimalkan Pemborosan di Industri Konveksi Pakaian

    Thumbnail
    View/Open
    Cover.pdf (811.0Kb)
    Fulltext (4.121Mb)
    Date
    2024
    Author
    Wijaya, Nicholas
    Advisor(s)
    Ginting, Rosnani
    Metadata
    Show full item record
    Abstract
    The convection industry generally has various production stages, namely the pattern making, cutting, sewing and finishing stages which include thread cleaning, ironing and packaging. The factors that influence production results usually lie in efficiency and effectiveness. In the production process, what must be eliminated or minimized is waste that does not provide added value. Waste activities will affect the performance of the production process. Waste identification is carried out to determine the type of waste and uses the Process Activity Mapping method to describe the activities in the production process at each work station. Value Stream Mapping is used to describe the overall flow of production process activities so that it can be seen where the dominant waste is located. Fishbone diagrams are used to show the cause and effect relationships that occur so that they can be seen clearly so that you can find out what the causes of waste are. The dominant location of waste in Value Stream Mapping occurs, namely waiting for raw materials to continue the production process due to a shortage of raw materials which causes the entire production process to stop due to a shortage of raw materials. The solution to minimize or eliminate this waste is to implement SOPs for order recipients so that they check raw material supplies when receiving orders to prevent waste. Followed by carrying out future state process activity mapping to make improvements to the production process. Next, carry out value stream mapping of the future state to make overall improvements from order receipt until finished goods are stored.
    URI
    https://repositori.usu.ac.id/handle/123456789/91798
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV