Show simple item record

dc.contributor.advisorRoesyanto
dc.contributor.advisorHasibuan, Gina Cynthia Raphita
dc.contributor.authorLubis, Muhammad Fadhil
dc.date.accessioned2024-03-06T04:04:31Z
dc.date.available2024-03-06T04:04:31Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/92180
dc.description.abstractTo carry out construction on soft soil, cases of land subsidence are often encountered. This is due to the low bearing capacity and small shear force, large compression, and very small permeability. To address this problem, one method that can be implemented is soil improvement using preloading and Prefabricated Vertical Drain (PVD). The aim of this research is to find out the magnitude of consolidation settlement by using analytical methods and by using PLAXIS 2D modeling at reclamation project locations besides CPO tanks between Belawan Islands based on Bore Log BH-02 data. It is also to compare coarse mesh, medium mesh, and fine mesh in PLAXIS 2D modeling, and to obtain the amount of land subsidence using preloading only and preloading with a combination of preloading and Prefabricated Vertical Drain (PVD) based on Bore Log BH-02 points. From the analytical results obtained a decrease of 1.254 meters. While the PLAXIS 2D modeling uses a medium mesh that has been combined with a PVD of 1.268 meters. This means that the results of the settlement by modeling using PLAXIS 2D are closer to the SP-02 settlement plate data of 1.270 meters. The settlement uses PLAXIS 2D with a coarse mesh of 1,266 meters and a fine mesh of 1,282 meters. While modeling using preloading only obtained a decrease of 0.340 meters. It can be concluded that the results of modeling using PLAXIS 2D in using medium mesh that has been combined with PVD are relatively closer to settlement data in the field with a percentage difference of 0.142% settlement plate SP-02 settlement.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectConsolidationen_US
dc.subjectPreloadingen_US
dc.subjectPrefabricated Vertical Drainen_US
dc.subjectPLAXIS 2Den_US
dc.subjectSDGsen_US
dc.titleAnalisis Pengaruh Preloading Kombinasi Prefabricated Vertical Drain pada Proses Konsolidasi di Proyek Reklamasi di Samping Tangki CPO antar Pulau Belawan Berdasarkan Bore Log Bh-2en_US
dc.typeThesisen_US
dc.identifier.nimNIM207016016
dc.identifier.nidnNIDN0029065102
dc.identifier.nidnNIDN0010108906
dc.identifier.kodeprodiKODEPRODI22101#Teknik Sipil
dc.description.pages122 Pagesen_US
dc.description.typeTesis Magisteren_US


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record