Show simple item record

dc.contributor.advisorSarah, Maya
dc.contributor.advisorBani, Okta
dc.contributor.authorPranoto, Marco
dc.date.accessioned2024-06-13T07:02:41Z
dc.date.available2024-06-13T07:02:41Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/93848
dc.description.abstractThe preliminary plant design of Glucose Syrup manufacturing plant using Hydrolysis Reactor has a production capacity of 5,000 tons/year and operates for 300 days a year. The main process in this factory design consists of 3 stages, namely the hydrolysis stage, neutralization stage and dye separation stage. The reaction is a hydrolysis reaction which takes place in a hydrolysis reactor with a temperature of 135°C with a residence time of 10 minutes and a neutralization reaction which takes place in a neutralization reactor with a temperature of 32°C with a residence time of 55 minutes. The cassava raw material needed to meet production capacity is 7,543,753 tons/year. The purpose of this preliminary plant design of Glucose Syrup manufacturing plant is to serve as a reference for establishing a glucose syrup manufacturing factory in Indonesia to meet the need for glucose syrup in Indonesia which is still dependent on imports from other countries and to optimize the availability of cassava which is very abundant in Indonesia and to determine the feasibility pre-factory design process from an economic perspective. The factory for making glucose syrup from cassava will be established in Cihaurkuning, Malangbong District, Garut Regency, West Java Province with a required land area of 11,568 m2. This factory for making glucose syrup from cassava uses a line and staff organizational form with a business entity in the form of a Perseroan Terbatas(PT). The number of employees required to operate the factory is 171 people. The results of the preliminary plant design economic analysis of the factory for making glucose syrup from cassava are as follows: - Total Capital Investment = Rp. 702.386.583.992,16 - Total Production Cost = Rp. 519.935.968.998,31 - Sales Results = Rp. 584.347.869.424,05 - Net Profit = Rp. 44.917.888.646,53 - Profit Margin (PM) = 28% - Break Even Point (BEP) = 23,6% - Return On Investment (ROI) = 19,4% - Pay Out Time (POT) = 5,2 years - Return On Network (RON) = 32,26% - Internal Rate of Return (IRR) = 24,01% Based on the results of the economic analysis, it can be concluded that the factory for making glucose syrup from cassava is feasible to establish.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectglucose syrupen_US
dc.subjectacid hydrolysisen_US
dc.subjecthydrolysis reactoren_US
dc.subjectSDGsen_US
dc.titlePra Rancangan Pabrik Pembuatan Sirup Glukosa dari Ubi Kayu melalui Hidrolisis Menggunakan HCl dengan Kapasitas Produksi 5.000 Ton/Tahun dan Tugas Khusus Rancangan Keteknikan Detil Reaktor Netralisasien_US
dc.title.alternativePre-Design of a Factory for Making Glucose Syrup from Cassava through Hydrolysis Using HCl with a Production Capacity of 5,000 Tons/Year and Special Tasks Detailed Engineering Design of the Neutralization Reactoren_US
dc.typeThesisen_US
dc.identifier.nimNIM180405146
dc.identifier.nidnNIDN0001057004
dc.identifier.nidnNIDN0001118802
dc.identifier.kodeprodiKODEPRODI24201#Teknik Kimia
dc.description.pages384 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record