• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Evaluasi Sistem Instalasi Kelistrikan pada Gedung Graha Pelindo 1 Belawan

    Evaluation of the Electrical Installation System at the Graha Pelindo 1 Belawan Building

    Thumbnail
    View/Open
    Cover (1.692Mb)
    Fulltext (13.03Mb)
    Date
    2023
    Author
    Graham, Otneil Ebel
    Advisor(s)
    Hardi, Surya
    Metadata
    Show full item record
    Abstract
    This research aims to evaluate the electrical installation system at Graha Pelindo I Belawan, which is rented, focusing on lighting and Air Conditioner (AC) loads in accordance with the General Electrical Installation Requirements (PUIL) of 2011. The evaluation primarily focuses on two crucial aspects, namely the cross-sectional area of the cable for current-carrying capacity and the selection of circuit breakers. The research involves measurements and calculations of the cable's cross-sectional area to ensure compliance with the PUIL 2011 standards, which are essential to maintain the smoothness and safety of the electrical flow. Furthermore, the analysis also focuses on the selection of circuit breakers, ensuring that the protective devices used align with the characteristics of the existing loads and comply with safety standards. This evaluation found that larger cable selections were made under the pretext of potential load additions. Additionally. There are still many inappropriate circuit breaker choices that should be given Miniature Circuit Breaker (MCB)2A, 44, 60A but Pelindo uses MCB with a rating capacity that is too large. The results of this evaluation will provide guidance to the building owners in determining the level of compliance of their electrical installation system with the 2011 General Electrical Installation Requirements (PUIL). Additionally, it will indicate whether repairs or improvements are necessary to ensure safety and optimal performance in supporting the lighting and air conditioning loads within the building.
    URI
    https://repositori.usu.ac.id/handle/123456789/93856
    Collections
    • Undergraduate Theses [1465]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV