• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Perbaikan untuk Meningkatkan Kualitas Produk Creambath dengan Pendekatan Lean Six Sigma dan Metode Triz di CV.XYZ

    Proposed Improvements to Improve the Quality of Creambath Products using the Lean Six Sigma Approach and the Triz Method at CV.XYZ

    Thumbnail
    View/Open
    Cover (1.086Mb)
    Fulltext (9.858Mb)
    Date
    2023
    Author
    Jennifer, Jennifer
    Advisor(s)
    Ishak, Aulia
    Metadata
    Show full item record
    Abstract
    CV. XYZ is a manufacturing company engaged in the hair care industry. The problem faced by the company is that there is waste such as waiting time and a product defect of 9.98% which exceeds the company's limit of 5%. The purpose of this research is to identify and eliminate non-value added activities and reduce product defects with Lean Six Sigma and proposed improvements with the TRIZ method. Based on the results of observations and measurements in CV. XYZ, obtained 19 value added time activities of 309.44 minutes, 4 necessary non value added time activities of 2.43 minutes and 2 non value added time activities of 63.28 minutes with manufacturing lead time of 375.15 minutes, process cycle efficiency level of 82.48% and process velocity of 0.0038 processes per hour. Then it is fixed in the material, human and method categories and further analyze using TRIZ to get improvement suggestions related to the factors that cause product defects. From the calculation results obtained a sigma level of 3.33 to 3.63 with the application of 50% of the estimated quality improvement results, then 2 non value added activities were eliminated so there is a reduction in manufacturing lead time of 63.28 minutes, an increase process cycle efficiency to 99.22%, and increase process velocity to 0.0033 processes per hour.
    URI
    https://repositori.usu.ac.id/handle/123456789/93870
    Collections
    • Undergraduate Theses [1480]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV