• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Implementasi Sistem Deteksi Gangguan, Isolasi dan Pemulihan dalam Meningkatkan Keandalan Sistem pada Penyulang PA.03-PA.07 (Studi Kasus: PT. PLN Unit Pelaksana Pengatur Distribusi Sumatera Utara)

    Analysis of the Implementation of the Fault Detection, Isolation and Recovery System in Improving System Reliability at the PA.03-PA.07 Feeder (Case Study: PT. PLN North Sumatra Distribution Management Implementation Unit)

    Thumbnail
    View/Open
    Cover (528.3Kb)
    Fulltext (2.008Mb)
    Date
    2023
    Author
    Anisah, Alfiqah Hati
    Advisor(s)
    Hasan, Syafruddin
    Metadata
    Show full item record
    Abstract
    The development of increasing electricity demand from year to year encourages PT. PLN (Persero) to provide electricity with good quality. The reliability of the electricity supply is also an important factor that can be improved by understanding the quality and reliability of service to consumers. One way to improve system reliability is to implement a fault detection, isolation, and recovery system called FDIR (Fault Detection, Isolation, and Restoration), an automated distribution network system that allows faster operation to restore power supply. This study aims to analyze the effect of FDIR implementation on SAIDI (System Average Interruption Duration Index) and ENS (Energy Not Served) on PA.03 and PA.07 feeders. The results showed that after the implementation of FDIR, there was a significant decrease in SAIDI and ENS values in PA.03 and PA.07 feeders. In the PA.03 feeder, there was a 99% decrease in percentage in SAIDI from 0.260868 minutes/customer to 0.002720 minutes/customer. As for the PA.07 feeder, there was a 99% decrease in percentage in SAIDI from 0.194689 minutes/customer to 0.002763 minutes/customer. The decrease in the percentage of ENS also occurred with a 96% decrease in the PA.03 feeder, from 1504.618736 kWh to 60.87351 kWh. In the PA.07 feeder, there was a 95% percentage decrease from 941.44900 kWh to 47.09189 kWh. These results show that FDIR implementation significantly lowers the value of SAIDI and ENS, indicating an increase in system reliability in the feeder studied.
    URI
    https://repositori.usu.ac.id/handle/123456789/94001
    Collections
    • Undergraduate Theses [1464]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV