Show simple item record

dc.contributor.advisorHasan, Syafruddin
dc.contributor.authorAnisah, Alfiqah Hati
dc.date.accessioned2024-06-24T03:16:30Z
dc.date.available2024-06-24T03:16:30Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/94001
dc.description.abstractThe development of increasing electricity demand from year to year encourages PT. PLN (Persero) to provide electricity with good quality. The reliability of the electricity supply is also an important factor that can be improved by understanding the quality and reliability of service to consumers. One way to improve system reliability is to implement a fault detection, isolation, and recovery system called FDIR (Fault Detection, Isolation, and Restoration), an automated distribution network system that allows faster operation to restore power supply. This study aims to analyze the effect of FDIR implementation on SAIDI (System Average Interruption Duration Index) and ENS (Energy Not Served) on PA.03 and PA.07 feeders. The results showed that after the implementation of FDIR, there was a significant decrease in SAIDI and ENS values in PA.03 and PA.07 feeders. In the PA.03 feeder, there was a 99% decrease in percentage in SAIDI from 0.260868 minutes/customer to 0.002720 minutes/customer. As for the PA.07 feeder, there was a 99% decrease in percentage in SAIDI from 0.194689 minutes/customer to 0.002763 minutes/customer. The decrease in the percentage of ENS also occurred with a 96% decrease in the PA.03 feeder, from 1504.618736 kWh to 60.87351 kWh. In the PA.07 feeder, there was a 95% percentage decrease from 941.44900 kWh to 47.09189 kWh. These results show that FDIR implementation significantly lowers the value of SAIDI and ENS, indicating an increase in system reliability in the feeder studied.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectReliabilityen_US
dc.subjectFDIRen_US
dc.subjectSAIDIen_US
dc.subjectENSen_US
dc.subjectSDGsen_US
dc.titleAnalisis Implementasi Sistem Deteksi Gangguan, Isolasi dan Pemulihan dalam Meningkatkan Keandalan Sistem pada Penyulang PA.03-PA.07 (Studi Kasus: PT. PLN Unit Pelaksana Pengatur Distribusi Sumatera Utara)en_US
dc.title.alternativeAnalysis of the Implementation of the Fault Detection, Isolation and Recovery System in Improving System Reliability at the PA.03-PA.07 Feeder (Case Study: PT. PLN North Sumatra Distribution Management Implementation Unit)en_US
dc.typeThesisen_US
dc.identifier.nimNIM190402128
dc.identifier.nidnNIDN0001075904
dc.identifier.kodeprodiKODEPRODI20201#Teknik Elektro
dc.description.pages71 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record