• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pra Rancangan Pabrik Pembuatan Asam Fosfat dari Batuan Fosfat dan Asam Sulfat melalui Proses Basah dengan Unit Purifikasi Short Tube Vertical Evaporator Kapasitas Produksi 30.000 Ton/Tahun

    Preliminary Factory for Making Phosphoric Acid from Phosphate Rock and Sulfuric Acid Using Wet Process with Short Tube Vertical Evaporator Purification Unit Production Capacity 30,000 Tons/Year

    Thumbnail
    View/Open
    Cover (1.394Mb)
    Fulltext (9.288Mb)
    Date
    2024
    Author
    Nasution, Kamla Sabila
    Sembiring, Adi Mulyanta
    Advisor(s)
    Surya, Indra
    Fath, Muhammad Thoriq Al
    Metadata
    Show full item record
    Abstract
    Phosphoric acid is an important chemical obtained by reacting phosphate rock with sulfuric acid through various processes and reactions. The main objective of this plant design is to assess the feasibility of establishing the plant. The pre-designed plant for the production of phosphoric acid from phosphate rock and sulfuric acid through a wet process with a short tube vertical evaporator purification unit has a production capacity of 30.000 tons/year and operates for 330 days a year. The main process in this pre-designed plant consists of four stages, namely the raw material preparation stage, reaction stage, purification stage, and packaging and storage stage. This phosphoric acid production plant from phosphate rock and sulfuric acid is planned to be established in the Karang Pilang industrial area, Surabaya, East Java Indonesia with a land area of 16,226 m2, the required workforce is 124 people with the form of a Limited Liability Company (PT) led by a director with a line and staff organization system. For the establishment and operation of the plant requires investment capital of IDR 1,444,506,592,227 and production costs of IDR 1,662,198,024,809. Based on the feasibility analysis, this plant has a BEP of 55.87%, ROI of 30.78%, POT for 3.25 years, RON of 51.30%, and IRR of 45.246%. From the results of economic analysis, it can be concluded that the pre-design of phosphoric acid production plant from phosphate rock and sulfuric acid by wet process is feasible.
    URI
    https://repositori.usu.ac.id/handle/123456789/95274
    Collections
    • Undergraduate Theses [1176]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV