    Analisis Produktivitas dan Waktu Tenaga Kerja pada Pekerjaan Struktur Balok dan Kolom (Studi Kasus : Pembangunan Struktur Weigo Houseware)

    Analysis of Productivity and Labor Time on Beam and Column Structural Work (Case Study: Construction of Weigo Houseware structures)

    Thumbnail
    View/Open
    Cover (611.8Kb)
    Fulltext (3.973Mb)
    Date
    2024
    Author
    Musfira, Cut Fatin
    Advisor(s)
    Syahrizal
    Metadata
    Show full item record
    Abstract
    In the implementation of construction projects, labor productivity is very influential on the speed of time in carrying out work to achieve maximum results. So it is necessary to conduct research to determine labor productivity and labor time with coefficients obtained based on calculations and observations. The analysis is only carried out on the level of productivity and time spent on carrying out work items and also to compare the calculation results with the results of AHSP PUPR 2022. The work items are the concrete structure of beams and columns of the 3rd floor and 4th floor. Based on the results of the study, it is known that the total value of labor productivity on the 3rd floor column work is 1,428.81 m³/day and the 4th floor is 912.93 m³/day, while on the 3rd floor beam work is 25,127.395 m³/day and on the 4th floor is 2,803.1643 m³/day. Coefficient value on the 3rd floor column work is 2.78 OH and on the 4th floor is 2.954 OH. The number of days required for the 3rd and 4th floor column concreting work is approximately 60 days, for formwork work is approximately 8 days, while for casting work is 1 day. The number of days spent on beam concreting work on floors 3 and 4 is 60 days, casting work is 1 day and for formwork work for approximately 114 days.
    URI
    https://repositori.usu.ac.id/handle/123456789/95399
    Collections
    • Undergraduate Theses [1513]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV