• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Chemical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Prarancangan Pabrik Asam Klorida dari Kalium Klorida dan Asam Sulfat dengan Proses Mannheim pada Kapasitas Produksi 45.000 Ton/Tahun (Tugas Khusus: Rancangan Keteknikan Detail Scrubber)

    Preliminary Plant Design of Hydrochloric Acid Manufacture from Potassium Chloride and Sulfuric Acid Using Mannheim Process with a Capacity of 45.000 Tons/Year (Special Task: Scrubber Detailed Enginnering Design)

    Thumbnail
    View/Open
    Cover (1.562Mb)
    Fulltext (7.663Mb)
    Date
    2024
    Author
    Gultom, Ricky Ridho Eberts
    Advisor(s)
    Harahap, Hamidah
    Metadata
    Show full item record
    Abstract
    Hydrochloric acid is a chemical molecule containing hydrogen and chlorine bonds, giving it an acidic nature. Numerous procedures are used to produce hydrochloric acid. This factory design's primary goal is to use chemical engineering concepts and offer preliminary data for creating a hydrochloric acid production facility. Pre-design of a factory for producing hydrochloric acid from potassium chloride salt and sulfuric acid using the Mannheim process with a production capacity of 45,000 tons/year. The main process in this factory design consists of 3 stages, namely the reaction stage, product separation stage and product purification stage. This hydrochloric acid factory is planned to be established in Sedari Village, Cibuaya District, Karawang City, West Java Province with a land area of 16,250 m2. The factory operates 24 hours per day, 330 working days per year with a total of 179 employees. The form of business entity at this hydrochloric acid factory is a Limited Liability Company (PT). To establish and operate the factory requires investment capital of IDR 853,772,754,833 and production costs of IDR 792,687,275,776. Based on the feasibility analysis, this factory has a BEP of 47.38%, ROI of 26.68%, POT of 3.75 years, RON of 44.47% and IRR of 30.68%. From the results of the economic analysis, it can be concluded that the design of a factory for producing hydrochloric acid from potassium chloride salt and sulfuric acid using the Mannheim process is feasible to establish.
    URI
    https://repositori.usu.ac.id/handle/123456789/95415
    Collections
    • Undergraduate Theses [1176]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV