• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Mitigasi Risiko pada Rantai Pasok Pengadaan Bahan Baku Menggunakan Supply Chain Operation Reference (SCOR) dan House Of Risk (HOR) di PT. Sari Gunung Berastagi

    Analysis of Risk Mitigation in the Raw Material Procurement Supply Chain Using Supply Chain Operation Reference (SCOR) and House of Risk (HOR) at PT. Sari Gunung Berastagi

    Thumbnail
    View/Open
    Cover (1.759Mb)
    Fulltext (4.722Mb)
    Date
    2024
    Author
    Silalahi, Koko
    Advisor(s)
    Ishak, Aulia
    Metadata
    Show full item record
    Abstract
    PT. Sari Gunung Berastagi is a manufacturing industry that produces passion fruit syrup, starting with the procurement process of passion fruit as raw material which serves as the input for the syrup production management process. Based on market demand data for passion fruit syrup, there are periods when demand cannot be met due to consumer trends and the availability of passion fruit, influenced by seasons, prices, and quality. PT. Sari Gunung Berastagi frequently experiences conditions of stockouts and overstocks, as well as delays in the procurement of raw materials, with 4 instances of overstock and 6 instances of stockout during the year 2023. The issues arise from the mismatch between raw material inventory and market demand. This research aims to identify risk events and risk agents within the company's supply chain, and to determine handling strategies to reduce the likelihood of risk agents arising. The data collection method for this study involved the entire company's employee population, with the sample selected being company executives due to their relevant knowledge. Based on the identification results, 26 risk events and 26 risk agents were identified using the supply chain operation reference. Based on house of risk I calculations, 14 priority risk agents were obtained to carry out mitigation actions. Where the highest priority risk agent with the highest aggregate risk potential value was 9.51%, namely the Supplier sent raw materials that did not match the quantity and quality of raw materials. The results of House of Risk I are used as input for House of Risk II and produce 15 risk mitigation actions that can be proposed to the Company. Mitigation actions that are effective and easy for the Company to carry out based on effectiveness to difficult calculations are considering the selection of suppliers in different locations. This action can minimize shipping costs and delivery times
    URI
    https://repositori.usu.ac.id/handle/123456789/96178
    Collections
    • Undergraduate Theses [1480]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV