Show simple item record

dc.contributor.advisorAnas, M Ridwan
dc.contributor.advisorBangun, Emma Patricia
dc.contributor.authorMaghfirah, Sarah
dc.date.accessioned2024-08-28T08:51:03Z
dc.date.available2024-08-28T08:51:03Z
dc.date.issued2023
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/96300
dc.description.abstractA Condition of flexible pavement will have a deteriorated during its service life receiving traffic loads. To keep the pavement is fuctioning, regular maintenance is required. However, maintenance carried out so far by the government cannot be carried out optimally because the budgeting system is based on the results of the back-calculation method/FWD value, where this method can only calculate handling needs per budget year. This has an impact on handling funding to become unsustainable. There are several methods that can be used to predict future damage including IRMS-V3 and RONET. Both have a basis for calculating the value of IRI as the main variable in predicting damage. The purpose of this study is to obtain damage prediction values based on IRI, LHR, and remaining design life using both methods. After obtaining the damage prediction value, the most appropriate handling needs can be calculated. The type of data used is secondary data sourced from North Sumatra BBPJN. The analysis is carried out by calculating the IRI value, traffic volume, and the remaining planned life for the next 5 years. Based on the results of the analysis obtained, road damage will occur more quickly using the RONET method. Road maintenance funds resulting from the IRMS-V3 method are more economical. Then validated using statistical t test. The results show that there is no difference in the average predicted IRI value, but there is a difference in the average predicted RSL value for the two methods.en_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectIRIen_US
dc.subjectIRMS-V3en_US
dc.subjectHDM-4en_US
dc.subjectRONETen_US
dc.subjectdeterioration predictionen_US
dc.subjectSDGsen_US
dc.titleAnalisis Prediksi Kerusakan Perkerasan Lentur Berbasis IRI (International Roughness Index) dengan Metode IRMS-V3 (Indonesia Road Management System Version 3) dan RONET (Road Network Evaluation Tools) (Studi Kasus Ruas Jalan Nasional Sp. Pangkalan Susu – Tanjung Pura)en_US
dc.title.alternativePrediction Analysis of Flexible Pavement Deterioration with IRI (International Roughness Index) Based for Comparison IRMS-V3 (Indonesia Road Management System Version 3) and RONET (Road Network Evaluation Tools) Method (Case Study of The National Road Sp. Pangkalan Susu – Tanjung Pura)en_US
dc.typeThesisen_US
dc.identifier.nimNIM197016027
dc.identifier.nidnNIDN0005087605
dc.identifier.nidnNIDN0030058305
dc.identifier.kodeprodiKODEPRODI22101#Teknik Sipil
dc.description.pages96 Pagesen_US
dc.description.typeTesis Magisteren_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record