• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Environmental Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Identifikasi Bahaya dan Analisis Risiko pada Pekerjaan Fabrikasi & Install Structure Shelter Menggunakan JSA (Job Safety Analysis) dengan Pendekatan HIRADC (Hazard Identification, Risk Assesment & Determining Control)

    Hazard Identification and Risk Analysis in Structure Shelter Fabrication & Installation Work Using JSA (Job Safety Analysis) with the Approach of HIRADC (Hazard Identification, Risk Assessment & Determining Control)

    Thumbnail
    View/Open
    Cover (761.6Kb)
    Fulltext (4.070Mb)
    Date
    2024
    Author
    Sibarani, Anastacia Febriyanti
    Advisor(s)
    Hasibuan, Novrida Harpah
    Metadata
    Show full item record
    Abstract
    Construction projects in their development often have risks. The risk that often occurs is work accidents. The Civil & Structure Preparation Works for Booster Compression Plant project is one of the construction jobs that also carries a high risk in terms of work accidents, where the work of fabricating and installing structure shelters is work that has a high level of risk in this project. Even though the implementation of risk management is quite effective, work accidents such as slips and near misses such as pinched hands still occur. The aim of this research is to identify potential dangers and risks, analyze the level of risk and analyze the control of dangerous risks that exist in the work of fabricating and installing shelter structures. This type of research uses semi-quantitative qualitative research methods, namely the JSA method with the HIRADC approach. Based on research that has been carried out, in structure fabrication work there are 47 hazard risk variables with 7 risks at extreme risk level, 12 risks at high risk level, 21 risks at moderate risk level and 7 work risks at low risk level. And in structure installation work there are 40 hazard risk variable with 10 risks at extreme risk level, 12 risks at high risk level, 12 risks at moderate risk level and 6 work risks at low risk level. The risk control plan to reduce risks carried out in this research is by carrying out control by means of elimination, technical engineering, administration, and personal protective equipment (PPE)
    URI
    https://repositori.usu.ac.id/handle/123456789/96758
    Collections
    • Undergraduate Theses [381]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV