• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perencanaan Sistem Pembangkit Hybrid pada Pembangkit Listrik Tenaga Sampah dan Pembangkit Listrik Tenaga Surya di TPA Terjun Kota Medan Menggunakan Hybrid Optimization Model for Electric Renewables (HOMER)

    Hybrid Power System Planning in Waste Power Plant and Solar Power Plant in Medan City's Terjun TPA Using Hybrid Optimization Model for Renewable Electricity (HOMER)

    Thumbnail
    View/Open
    Cover (1.641Mb)
    Fulltext (3.880Mb)
    Date
    2024
    Author
    Nugroho, Rizal
    Advisor(s)
    Suherman
    Safril, Muhammad
    Metadata
    Show full item record
    Abstract
    New and renewable energy plays a crucial role in supporting sustainable energy supply, including energy from solar thermal, wind power, solar power, biological processes, and other sources. These energies can be optimized to generate electricity through the use of appropriate equipment and processes, thereby reducing dependence on fossil fuels in power generation. An example of the application of new and renewable energy is the utilization of waste and solar energy in a Hybrid Power Plant (PLTH) system. PLTH combines two or more renewable energy sources to increase the energy, effectiveness, and efficiency of the system. This research aims to design a hybrid power plant with a capacity of 690 kW, integrating Waste Power Plant (PLTSa) and Solar Power Plant (PLTS) using HOMER software, with the research location at Terjun Landfill (TPA), Medan City. Terjun landfill has a daily waste volume of 132 m³ or 324,000 kg/day and a solar radiation intensity of 4.4 kWh/m²/month. The results showed that energy production from both plants reached 736,182 kWh per year, with a total net present cost (NPC) at the optimal configuration of Rp. 35,876,036,503.4. The cost of electricity generation (COE) was recorded at Rp. 15,011.57 per kWh with full energy production from the waste-to-energy plant and solar power plant for one year
    URI
    https://repositori.usu.ac.id/handle/123456789/97645
    Collections
    • Undergraduate Theses [1461]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV