Show simple item record

dc.contributor.advisorSuherman
dc.contributor.advisorSafril, Muhammad
dc.contributor.authorNugroho, Rizal
dc.date.accessioned2024-09-25T07:54:45Z
dc.date.available2024-09-25T07:54:45Z
dc.date.issued2024
dc.identifier.urihttps://repositori.usu.ac.id/handle/123456789/97645
dc.description.abstractNew and renewable energy plays a crucial role in supporting sustainable energy supply, including energy from solar thermal, wind power, solar power, biological processes, and other sources. These energies can be optimized to generate electricity through the use of appropriate equipment and processes, thereby reducing dependence on fossil fuels in power generation. An example of the application of new and renewable energy is the utilization of waste and solar energy in a Hybrid Power Plant (PLTH) system. PLTH combines two or more renewable energy sources to increase the energy, effectiveness, and efficiency of the system. This research aims to design a hybrid power plant with a capacity of 690 kW, integrating Waste Power Plant (PLTSa) and Solar Power Plant (PLTS) using HOMER software, with the research location at Terjun Landfill (TPA), Medan City. Terjun landfill has a daily waste volume of 132 m³ or 324,000 kg/day and a solar radiation intensity of 4.4 kWh/m²/month. The results showed that energy production from both plants reached 736,182 kWh per year, with a total net present cost (NPC) at the optimal configuration of Rp. 35,876,036,503.4. The cost of electricity generation (COE) was recorded at Rp. 15,011.57 per kWh with full energy production from the waste-to-energy plant and solar power plant for one yearen_US
dc.language.isoiden_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.subjectHOMERen_US
dc.subjectHybriden_US
dc.subjectwaste-to-energy planten_US
dc.subjectsolar power planten_US
dc.subjectSDGsen_US
dc.titlePerencanaan Sistem Pembangkit Hybrid pada Pembangkit Listrik Tenaga Sampah dan Pembangkit Listrik Tenaga Surya di TPA Terjun Kota Medan Menggunakan Hybrid Optimization Model for Electric Renewables (HOMER)en_US
dc.title.alternativeHybrid Power System Planning in Waste Power Plant and Solar Power Plant in Medan City's Terjun TPA Using Hybrid Optimization Model for Renewable Electricity (HOMER)en_US
dc.typeThesisen_US
dc.identifier.nimNIM170402036
dc.identifier.nidnNIDN0002027802
dc.identifier.nidnNIDN0120048102
dc.identifier.kodeprodiKODEPRODI20201#Teknik Elektro
dc.description.pages91 Pagesen_US
dc.description.typeSkripsi Sarjanaen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record