• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Electrical Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Perancangan Sistem Kompensasi Daya Reaktif Otomatis dan Pemantauan Perkiraan Biaya Tagihan pada Sistem Kelistrikan Daya 2200 Va

    Design of Automatic Reactive Power Compensation System and Monitoring of Estimated Billing Costs in 2200 Va Power Electricity System

    Thumbnail
    View/Open
    Cover (728.9Kb)
    Fulltext (1.295Mb)
    Date
    2024
    Author
    Nainggolan, Gery Dasayev
    Advisor(s)
    Rangkuti, Hasdari Helmi
    Metadata
    Show full item record
    Abstract
    Electricity is energy that can be converted into other energy, producing heat, light, chemistry, or motion. The use of electricity is very visible in daily activities such as turning on lights and other electronic devices. Large electricity bills occur due to intentional or unintentional waste of electricity. There are cases of electricity theft that are unknown so that suddenly the bill that has to be paid exceeds normal usage. Efforts to save electricity bill costs, namely by increasing electricity efficiency with a power capacity of 2200 VA, can be done by improving the quality of electric power. Researchers will design an automatic reactive power compensation system to improve and increase the power factor value as an effort to increase electric power efficiency. Based on research results, the average increase in power factor in this power factor improvement system is around 0.11 with a direct power compensation of around 418.73 VAR, the power factor improvement system can send sensor readings and power factor measurement results to the thingspeak platform in graphic format in 5 once a second and the average reduction in electrical energy consumption costs is around Rp. 131.32 per hour, it is assumed that the savings that occur in 1 month are around Rp. 94,549,611
    URI
    https://repositori.usu.ac.id/handle/123456789/97650
    Collections
    • Undergraduate Theses [1461]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV