• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Usulan Penjadwalan Produksi Sepatu untuk Meminimasi Makespan Menggunakan Metode Algoritma Tabu Search dan Algoritma Branch and Bound pada CV Kotama Shoes

    Schedulling Shoe Production oo Minimize Makespan using The Tabu Search Algorithm Method and The Branch and Bound Algorithm Method on Kotama Shoes Company

    Thumbnail
    View/Open
    Cover (1.781Mb)
    Fulltext (7.230Mb)
    Date
    2024
    Author
    Sari, Firda
    Advisor(s)
    Ukurta
    Metadata
    Show full item record
    Abstract
    In the production process, obstacles are often encountered, such as the product not reaching consumers on time. Company scheduling can minimize costs and production time, so that orders are completed according to the agreed time. CV. Kotama Shoes is a craft industry which operates in the field of shoe making. The scheduling system implemented is first come first serve (FCFS). Based on observations, there were delays in fulfilling orders in the periods May, August, September 2023 and January 2024. The high production process time at certain stations caused the completion time (makespan) required on the production floor to increase. With the proposed tabu search and branch and bound methods, it is hoped that the product completion time (makespan), namely the amount of time required to complete the processing of all work, will be shorter. Setting the job sequence by minimizing makespan using the tabu search method produces an E-D-C-B-A job sequence with a makespan value of 101,57 hours. The branch and bound method also produces the same final result, namely an E-D-C-B-A job sequence with a makespan value of 101,57 hours. Both proposed methods are better than the company's actual method with a makespan value of 110,95 hours. The proposed method obtains a lower makespan than the actual method with a relative error value of 9.24%.
    URI
    https://repositori.usu.ac.id/handle/123456789/97924
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV