• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Analisis Mitigasi Risiko pada Aktivitas Pengadaan Sparepart Menggunakan Metode Interpretive Structural Modelling (ISM) dan House of Risk (HOR) di Warehouse PT United Tractors Tbk Cabang Medan

    Risk Mitigation Analysis on Spare Part Procurement Activities using Interpretive Structural Modelling (ISM) and House of Risk (HOR) Methods at Warehouse PT United Tractors Tbk Medan Branch

    Thumbnail
    View/Open
    Cover (1.806Mb)
    Fulltext (9.864Mb)
    Date
    2024
    Author
    Pinem, Emita Valerina
    Advisor(s)
    Sugiharto
    Nasution, Fadylla Ramadhani Putri
    Metadata
    Show full item record
    Abstract
    Spare part procurement activities are crucial processes to support the smooth operation of activities within a company. PT United Tractors Tbk Branch Medan, as a distributor of heavy equipment, has the responsibility to support the use of its products through after-sales services, namely spare part procurement and service provision. The emergence of risks in the spare part procurement process at the warehouse can potentially hinder the handling of customer requests for immediate repair and maintenance of heavy equipment units in the field. PT United Tractors Tbk Branch Medan faces procurement risks such as delays in the delivery of spare parts from suppliers due to limited availability of spare part quantities. Therefore, this research aims to analyze the risks associated with the spare part procurement process in the company's warehouse and provide appropriate mitigation recommendations. The Interpretive Structural Modeling (ISM) method is used to identify the relationships between risks. Then, the House of Risk (HOR) method is employed to determine priority risks and design appropriate mitigation actions. The analysis results indicate the existence of 44 risk events and 40 risk agents. From the ISM results, risks are classified into twenty-six levels, and 4 sectors of MICMAC analysis are obtained, resulting in 22 risks identified as priorities. Based on the analysis, 12 risk mitigation actions are recommended for the company. Spare part scarcity is identified as the main risk, with the risk mitigation recommendation being routine Stock Keeping Unit (SKU) analysis and adding minimum stock at the warehouse.
    URI
    https://repositori.usu.ac.id/handle/123456789/97925
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV