• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Penjadwalan Produksi Menggunakan Metode Palmer pada PT Sinar Utama Jaya Abadi

    Production Scheduling using The Palmer Method at PT Sinar Utama Jaya Abadi

    Thumbnail
    View/Open
    Cover (1.485Mb)
    Fulltext (7.668Mb)
    Date
    2024
    Author
    Simanjuntak, Josafat Christ Marsahala
    Advisor(s)
    Tambunan, Mangara Mangapul
    Metadata
    Show full item record
    Abstract
    Delays in completing production are a problem in a company due to the production scheduling system. Scheduling is needed by a company to increase productivity by reducing idle time during the production process. PT Sinar Utama Jaya Abadi is a shoe manufacturing company in Indonesia with shoe brands produced by the company, namely Adidas, Nike, Ecco, and Mizuno. The current problem with the company is that there is a company delay in producing goods using the company's current scheduling method, namely the FCFS (First Come First Serve) method. Therefore, a new production scheduling is needed for the company using the Palmer method in order to solve the problem of production delays in the company. Scheduling using the Palmer method will produce a new scheduling order based on the slope index value for each job, a larger slope index value will be prioritized in job sequencing. The aim of this research is to calculate the makespan for each brand using the FCFS method and Palmer method, calculate the performance of the FCFS method and Palmer method for each brand, and produce a new production schedule for the company. Based on the performance between the company method and the Palmer method, using the Palmer method in production scheduling produces better performance compared to the company method so that using the Palmer method in production scheduling will get better results compared to using the FCFS method.
    URI
    https://repositori.usu.ac.id/handle/123456789/97934
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV