• Login
    View Item 
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    •   USU-IR Home
    • Faculty of Engineering
    • Department of Industrial Engineering
    • Undergraduate Theses
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pengurangan Waste dengan Pendekatan Lean Manufacturing dan Value Stream Mapping pada Proses Produksi di PT. Starindo Prima

    Reducing Waste with a Lean Manufacturing Approach and Value Stream Mapping in The Production Process at PT. Starindo Prima

    Thumbnail
    View/Open
    Cover (895.0Kb)
    Fulltext (7.012Mb)
    Date
    2024
    Author
    Wijaya, David
    Advisor(s)
    Tambunan, Mangara Mangapul
    Alda, Tania
    Metadata
    Show full item record
    Abstract
    PT Starindo Prima is a manufacturing company engaged in the wooden furniture industry. The problem faced by the company is that there is waste such as excessive process activities (overprocessing) and waiting time (waiting time) that is too large in its production activities so that it can affect production speed and operating costs used by the company. The aim of this research is to identify and eliminate non-value added activities in production activities using the Lean Manufacturing and Value Stream Mapping methods as well as providing suggestions for improvements using the Fault Tree Analysis method. Based on the results of observations and measurements at PT. Starindo Prima has 26 activities with non value added time of 27,46 minutes, manufacturing lead time of 204,07 minutes, process cycle efficiency level of 77,68 % and process velocity of 0.0492 processes/hour. Then, elimination of 2 non-value added activities was carried out and improvement results were obtained by reducing activities to 24 activities, non-value added time to 7,07 minutes, manufacturing lead time to 183,68 minutes, process cycle efficiency increased to 86,30 % and process velocity decreased to 0.0454 processes/hour. After improvements were made, there was an increase in the number of production per month from 2,650 pieces/month to 2.914 pieces/month. Based on the results of the analysis using Fault Tree Analysis, suggestions for improvement that can be given are carrying out routine supervision of operators, replacing simple equipment with more efficient machines and creating routine maintenance and cleaning schedules, creating and establishing work procedures.
    URI
    https://repositori.usu.ac.id/handle/123456789/98444
    Collections
    • Undergraduate Theses [1479]

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of USU-IRCommunities & CollectionsBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit DateThis CollectionBy Issue DateTitlesAuthorsAdvisorsKeywordsTypesBy Submit Date

    My Account

    LoginRegister

    Repositori Institusi Universitas Sumatera Utara (RI-USU)
    Universitas Sumatera Utara | Perpustakaan | Resource Guide | Katalog Perpustakaan
    DSpace software copyright © 2002-2016  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV